Categories
Cart
CATEGORIES
- CDR/RW DVDR/RW Media 1
- KVM Switch Video 1
- Memory 1
- Mouse 0
- Network – Consumer 0
- Network – UISP 0
- Accessories 1
- Wired 2
- Wireless 0
- Network – UniFi 1
- Notebook Accessories 0
- Printer Consumable 0
- Printer Hardware 0
- Scanner and Labeller 0
- Servers 0
- Speakers Headsets Mic 0
- Headset 0
- UPS Power Board 0
- USB Bluetooth IEEE 0
HP EliteBook 860 G10 16″ WUXGA TOUCH Intel i7-1355U 16GB DDR5 512GB SSD WIN 11 PRO Iris Xe WIFI6E Thunderbolt Fingerprint Backlit 3yr OS 1.7kg
$2,643.85 inc GST
Manufacturer: HP
Availability: BRS:CALL ADL:CALL SYD:1 MEL:CALL WA:CALL
1 in stock
HP EliteBook 860 G10 16″ WUXGA TOUCH Intel i7-1355U 16GB 512GB SSD WIN11 DG 10 PRO Iris Xe Graphics WIFI6E Thunderbolt Backlit 3yr OS 1.7kg
Processor Intel Core i7-1355U Processor (up to 5.0 GHz with Intel Turbo Boost Technology, 12 MB L3 cache, 10 cores, 12 threads)
Operating System Windows 11 Pro DG Windows 10 Pro
Display 16″ diagonal, WUXGA (1920 x 1200), touch, IPS, anti-glare, 250 nits, 45% NTSC
Memory 16 GB DDR5-4800 MHz RAM (1 x 16 GB)
Storage 512 GB SSD
Graphics Intel Iris Xe Graphics
Ports Slots
2 Thunderbolt 4 with USB Type-C 40Gbps signaling rate (USB Power Delivery, DisplayPort 1.4)
2 USB Type-A 5Gbps signaling rate (1 charging)
1 HDMI 2.1
1 Stereo headphone/microphone combo jack
Wireless Intel Wi-Fi 6E AX211 (2×2) and Bluetooth 5.3 wireless card (supporting gigabit data rate)
Battery HP Long Life 3-cell, 51 Wh Li-ion polymer
Audio Audio by Bang Olufsen
Webcam 5 MP IR Camera
Fingerprint Reader Yes
Keyboard HP Premium Keyboard
Dimensions (W x D x H) 35.87 x 25.1 x 1.92 cm
Weight Starting at 1.73 kg
Warranty 3-Years Onsite
Weight | 3.44 kg |
---|---|
Dimensions | 482 × 108 × 342 mm |
Availability Total | 1 |
Manufacturer | |
Warranty Length | |
Product Create Date | |
Manufacturer SKU | |
Web Link | https://h20195.www2.hp.com/v2/GetDocument.aspx?docname=c08487724 |
Opt Accessory |
Drop Shipped Delivery
This product is DROPSHIPED from Brisbane | Adelaide| Sydney| Perth| Melbourne via Star Track and Aus Post.
Related products
ABOUT
OzSpots Wireless is an Australian re-seller and Managed Service Provider for, Ubiquiti, Tp-link and various IT products, we previously worked with Open-Mesh (pre Datto).
KNOW MORECUSTOMERS
At a time when the cruise industry is moving to larger and less personal ships, we have limited the size of our ships to maximise the expedition experience. Our small-batch cuisine is freshly prepared onboard with a simplistic and generous approach to quality and freshness, accompanied by quality Australian wine.
Come and enjoy a stay with the QCWA.
Clean & Comfortable 3 Star Self-contained
One & Two bedroom holiday units.
Just a one hour very scenic drive north from Cairns International Airport. As this Holiday Apartment Accommodation is located in the heart of Port Douglas you are only a short stroll away from everything – beautiful 4 Mile Beach, 5 star restaurants, boutique and international designer shops, the eclectic Sunday market to the fabulous Meridien Marina – main departure point for the Great Barrier Reef.
Experience some of the best Accommodation Port Douglas has to offer. The Balboa Apartments are very spacious, fully self contained holiday accommodation adjacent to the famous Four Mile beach.
Experience some of the best Accommodation Port Douglas has to offer. The Driftwood Apartments fully self contained holiday accommodation adjacent to the famous Four Mile beach.
With our quiet and convenient location, and our friendly and knowledgeable staff, we hope to make your time in Cairns pleasurable. If you are looking for relaxing, unpretentious and economical accommodation for your stay, look no further.
Amaroo Resort at Trinity Beach captures the true essence and beauty of all that Far North Queensland has to offer without the hustle and bustle of the busier beach locations.
Kaban Green Power Hub is a renewable energy project located in the Atherton Tablelands of Far North Queensland.
It consists of a 157 MW wind farm with approval for a 100 MW battery, and a network upgrade.
The project has a power purchase agreement with CleanCo to provide energy in support of Queensland’s target of 50% renewable electricity by 2030.